No descrepancies noted
Requirements Management Plan, Rev 1.0 (Final), 25 Apr 97
No descrepancies noted
Software Requirements Specification, SRS (Final), 5 May 97
Title Page. SRS dated after baseline date of customer deliverable; this date should be changed to 28 Apr 97.
Rationale: Consistency with baselining of all other SPM documents.
Software Project Management Plan, Rev 2.0, 28 Apr 97
Para 1.2. Need to add Quality Assurance Test Plan (Final), Test Analysis Report to the list of deliverables.
Rationale: Consistency with QA and CM final plans.
Para 1.4. For consistency, should also reference
final versions of Risk Mitigation Plan (4/27/97), Configuration
Management Plan (4/27/97), and QA/Test Plan (4/28/97).
Software Design Document, (Final), 24 Apr 97
No title page for document. A cover page should
be generated since this document is referenced in the software
project management plan.
Work Breakdown Structure, 28.APR.97.1, 28 Apr 97
Para 4.6. The implementation and delivery of web pages/sections containing links to other SWSE 625 sites and MJY Team draft project documents section not specified (this was tested and annotated during Build 2 testing.)