1.0. Introduction 1
1.1. Purpose 1
1.2. Project Description 1
1.3. Product Deliverables 1
1.4. Target Environment 2
2.0. Project Organization and Responsibilities 2
3.0. Quality Assurance Plan Activities 2
3.1. Documentation Audits 2
3.2. Code Inspections 3
3.3. Document Reviews 3
3.4. Data Collection 3
4.0. Verification, Validation, and Test 4
4.1. Test Items 4
4.2. Pass Criteria for Items Under Test 5
4.3. Test Deliverables 6
4.4. Test Responsibilities 6
APPENDICES
B. Document Review - Build 3 Test
C. Document Review - Customer Delivery Baseline
1.3.1. HTML and CGI scripts that implement basic site and web
page functionality;
1.3.2. Final version of all software project documents and plans;
1.3.2.1. Software Requirement Specifications;
1.3.2.2. Software Design Document
1.3.2.3. Requirements Management Process Document
1.3.2.4. Risk Mitigation plan;
1.3.2.5. Project Management plan;
1.3.2.6. Project Management schedule;
1.3.2.7. Quality Assurance/Test plan;
1.3.2.8. Test Analysis Report;
1.3.2.9. Configuration Management plan;
1.3.3. Contents of all web pages when baselined for customer delivery;
1.3.4. Description of the projectís software tool suite
used in development, test, quality assurance, and configuration
management activities
3.1.1 Document audits are required when:
3.1.1.1. Final documents for a completed development phase are
submitted for CM;
3.1.1.2. Final versions of project documents are delivered to
CM for inclusion into the project baseline
3.1.2. All project team members will review documents for format
and content (within their area of responsibility) within one week
of submission date by originator.
3.1.2.1. QA review of documents will focus on consistency among
and between documents. Particular attention will be paid to possible
conflicts between the various managers' described plans and processes.
3.1.3. Document any errors and recommended remedial actions by
supplying information identified in paragraph 3.4.1 to the document
originator and QA.
3.1.4. QA will follow up on remedial actions/review reworked document
prior to CM submission
3.1.5. Document audits will be accomplished according to the schedule
contained in the latest version of MJY work breakdown schedule.
3.2.1. Review of HTML and CGI scripts by QA will not be accomplished
for this project. Script adequacy will be determined by how it
performs during (incremental) unit testing, with corrections to
script(s) on an as-required basis.
3.3.1. Document reviews will be accomplished when original or
updated project plans/documents listed in paragraph 1.3.4 will
be entered into CM. In addition, QA will perform informal document
reviews as part of its incremental test activities.
3.3.2. All project team members will review documents for format
and content (within their area of responsibility) within one week
of submission date by originator. QA review responsibilities are
identical to those outlined in paragraph 3.1.2.
3.3.3. Document any errors and recommended remedial actions IAW
paragraph 3.4.1, and submit (electronic) copies to the document
originator and QA.
3.3.4. QA will follow up on recommended actions during the next
review of the document in question.
3.4.1. Error Detection/Tracking. The following information is
required for each error discovered during scheduled review, audit,
or test. QA will supply items 3.4.1.1., 3.4.1.5., and 3.4.1.6;
the remaining items will be supplied by the individual discovering
the error.
3.4.1.1. Error Tracking Number
3.4.1.2. Short error description
3.4.1.3. Development Activity when error discovered
3.4.1.4. Recommended remedial action
3.4.1.5. Date Recommended remedial action accomplished
3.4.1.6. Date error closed
4.1. Test Items. The test program will
evaluate the following capabilities/functions:
4.1.1. MJY web site connectivity (access via Internet connection)
4.1.2. MJY web page basic functionality
4.1.2.1. Viewability of each web page section using Netscape 2.0
or equivalent browsers
4.1.2.2. Ability to download files when this capability is indicated
4.1.2.3. Ability to correctly navigate within the web site (ie, ensure that each link or function
button takes the reader to the designated section of the web page or document).
4.1.3. MJY Bulletin Board functionality
4.1.3.1. Link connectivity (ie, can you connect to bulletin board
from designated MJY web page links)
4.1.3.2. View existing message threads (original message and any
responses)
4.1.3.3. Download posted messages or responses
4.1.3.4. Post a message. Test will ensure that bulletin board
posts message, and designates post as an original message.
4.1.3.5. Post a response to an existing message. Test will ensure
that the response is appended to the correct message or response
threads, and is designated as a response.
4.1.4. MJY links to other external sites
4.1.4.1. (Verify) Number of links in each category
4.1.4.2. Link connectivity (ie, can you connect to specified external
site)
4.1.4.2. (Verify) Content of each site appropriate for each category
4.1.4.3. Site content viewability
4.1.4.4. Ability to download web page information (if permitted
by that site)
4.2. Pass criteria for items under test
4.2.1. HTML links test.
4.2.1.1. The deliverable will contain the minimum number of links
as specified in the SRS.
4.2.1.2. There will be a 90% successful connection rate for all
testable links. Two attempts, separated by at least 4 hours, will be made before determining
the connection to a target link as unsuccessful.
4.2.2. Web page contents.
4.2.2.1. The information contained on delivered links will be
directly relevant to subjects cited in WBS paragraphs 1.1.2. through
1.1.7
4.2.2.2. The web page section contains the minimum number of items
(keywords, "lessons learned," publications citation )specified in the corresponding
SRS section.
4.2.2.3. Web page contents are readable (by a user reviewing the
item "on-site") using standard web browsers.
4.2.2.4. Web page contents will be downloadable and using 7 HTML
or later browsers (user must be able to download and view/print a usable hard copy of
downloaded document.)
4.2.3. Bulletin Board Functionality
4.2.3.1. Link connectivity (ie, can you connect to bulletin board
from designated MJY web page links)
4.2.3.2. View existing message threads (original message and any
responses)
4.2.3.3. Download posted messages or responses
4.2.3.4. Post a message or response to an existing message. Test
will ensure that message is posted, or that response is appended
to the correct message thread.
4.3.1. All test error detection/tracking logs. These will be part
of each phased test report. This data will also be contained in
the overall QA error tracking log
4.3.2. Test cases for each test session. These will be part of
each phased test report.
4.3.3. Final test report which certifies the product meets SRS
requirements. Report will also indicate which SRS requirements--if
any--were not successfully demonstrated, with any recommended
remedial actions.
4.4. Test responsibilities. Test team
will be responsible for the following:
4.4.1. Schedule all test activities.
4.4.2. Coordinate, as required, requests for personnel augmentation
with other project team managers.
4.4.3. Notify developer and program manager of any deficiencies
found during testing (along with any recommended remedial actions)
4.4.4. Review deficiency reports submitted to the developer or
program manager for additional items that should be spot checked
during the next scheduled test phase.
4.4.5. Establish and maintain an error detection/tracking log
(will be part of each test template)
4.4.6. Prepare and submit the test report