Testing Methodology: Each web page link has been subjected to the following tests: connectivity (can it connect to the indicated URL?); readability (can I read the page once connection is established?); and operation /download capability (once linked, can I manipulate the functionality at the "linked" site. If it has document download capability, can I download a readable copy of the document?). Download is marked "N/A" if the site has no download capability (other than saving display as an HTML file).
Test Results: The existing web page meets SRS Build 1(prototype)
requirements. One error was found on another web site during secondary
(sublink) testing, and therefore does not require corrective action
on the part of the MJY development team. (We will retest this
link during Build 2).
Test Results Summary Table
| ITEM | Connect | Readable | Ops/Dnld | Sublink | Sublink | Sublink | Risk |
| Connect | Readable | Ops/Dnld | Related | ||||
| *** Intro Risk Mgmt (4.6.4.) - Build 2 | |||||||
| *** Team Project Documents - Prototype Check Only | |||||||
| 1. Team Member Roles | |||||||
| 2. Requirements Process Plan | |||||||
| 3. SW Reqmnts Specification | |||||||
| 4. Risk/Risk Mgmt Plan | |||||||
| 5. Work Breakdown Structure (C1) | |||||||
| 6. SW Proj Mgmt Plan | |||||||
| 7. S/W Design Doc | |||||||
| 8. QA / Test Plan | |||||||
| 9. Config Mgmt Plan | |||||||
| *** Risk Mgmt Chat Room (4.6.2.) - Build 2 | |||||||
| *** Bibliography (4.8.2.) - Final Build | |||||||
| *** Levity Section (4.7.2.) - Build 3 | |||||||
| *** Lessons Learned Section (4.8.3.) -- Final Build | |||||||
| *** Final (Term) Papers (4.8.1.) -- Final Build | |||||||
| Jordan | |||||||
| May | |||||||
| McNeese | |||||||
| Miller | |||||||
| Mirantes | |||||||
| Mundell | |||||||
| Young | |||||||
| *** Related Site (4.6.3.) - Prototype Check Only (C2) | Connect | Readable | Ops/Dnld | Sublink | Sublink | Sublink | Risk |
| Connect | Readable | Ops/Dnld | Related | ||||
| 1. HMS Software | |||||||
| 1a. S/W White Papers | |||||||
| 1b. PM Resources | |||||||
| 1c. SW PM Articles | |||||||
| 2. Key practices of CMM | |||||||
| 2a. Lvl 2-Proj Tracking | |||||||
| 3. ProjectNet | |||||||
| 4. Practical SW Measurement | |||||||
| 5. SW Engr Institute | |||||||
| 5a. Featured Publications of SEI | |||||||
| 5b. SEI Risk Program | |||||||
| 5c. SEI SW Engr Risk Repository | |||||||
| 5d. SEI Conf on Risk Mgmt | |||||||
| 6. SW Risk Mgmt @ ASU | |||||||
| 7. Config Mgmt Yellow Pages | |||||||
| 8. NASA IV&V Facility Home Page | |||||||
| 8a. IV&V Related Links | |||||||
| 9. | |||||||
| 10. | |||||||
| *** Tools (4.7.3.) Build 3 | |||||||
| 1. | |||||||
| 2. | |||||||
| 3. | |||||||
| 4. | |||||||
| 5. | |||||||
| *** WEB Searches on Risk Mgmt (4.6.5.) - Build 2 |
Prefix Legend
(E) -- error;
(D) -- defect;
(C) -- comment;
*** -- Major Requirement Descriptor (Note: the related WBS numeric identifier comes in parentheses immediately following the descriptor)
Notes
1. (C) Only includes verbal descriptions - no project charts or graphs
2. (C) Based on discussion with Program Manager, the requirement for (minimum) 10 links to related websites (WBS requirement 4.6.3.)does not preclude the use of multiple links from our web page to a single website. It was also decided that links to S/W Project Management site that are not directly risk related will nonetheless count as a viable link. Therefore, we have 16 active links (one link failed to connect during test), which meets minimum SRS for Build 2. I will continue to group links by web site, and indicate link content (risk/non-risk related) to facilitate testing/tracking.
3. (E) Featured Publications of SEI link - error during connection;
appears to be an SEI site problem--retest during Build 2.